Client: Voestalpine Wire Austria Year of Construction: 2023 Scope of Work: Flap gate 28 x 1,4m - installation in existing structure
unsichtbar
Food Protection Tollingbach
Client: ARGE Voestalpine Donawitz HWS Year of Construction: 2023 Scope of Work: Bottom outlet penstock 1,5 x 2,5 m Sliding penstock for bypass line 1,2 x 1,2 m Bottom outlet screen 4 x 34 m Bypass line D1000 47 lfm Railing 175 lfm Cable bridge 45 m
unsichtbar
Hydropower Plant Fischgarten
Client: HKM Fischgarten Year of Construction: 2023 Scope of Work: Shut-off penstock 3 x 1,8 m Metalwork
unsichtbar
Hydropower Plant Karthäusenbach
Client: RH Wasserkraft Year of Construction: 2023 Scope of Work: Inlet funnel DN1000–DN400 Flow measurement Emergency inlet penstock 1,3 x 1,3m Flush penstock Compensation valve
unsichtbar
Hydropower Plant Priel
Client: Kittelmühle Wasserkraft Year of Construction: 2023 Scope of Work: Bottom outlet penstock with flap – installation in existing structure Repair of vertical rake cleaning system
unsichtbar
Hydropower Plant Regensburger
Client: Regensburger Dietmar Year of Construction: 2023 Scope of Work: Inlet flap gate 7,5 x 0,8m Flush and compensation penstock 3 x 1,3m Fine tash rack Armour plating FAH-penstock