Projects 2005 – 2020

Hydropower Plant Eberstein
Year of Construction: 2020
Scope of Work:
Flap gate 10 × 2.5 m
Control flap 4.7 × 0.75 m
Ulmen-style rake cleaning system 4.7 × 1.4 m
FAH and compensation gates 0.5 × 0.5 m
Desander flushing gates 4.7 × 1.5 m
Outlet gates at powerhouse 2.5 × 2.7 m
Inlet gates with integrated coarse rack 4.7 × 1.5 m

Hydropower Plant Wietersdorf
Year of Construction: 2020
Scope of Work:
Flap gate 10 × 2.5 m
Control flap 4.7 × 0.75 m
Ulmen-style rake cleaning system 4.7 × 2.2 m
FAH and compensation gates 0.5 × 0.5 m
Bypass gates 2.4 × 1.67 m
Desander flushing gate 4.7 × 1.55 m
Flusing gate with flap on top 2.5 × 2.5 m
Outlet gate at powerhouse 2.4 × 2 m
Inlet gates with integrated coarse rack 4.7 × 1.5 m
Hydropower Plant Gurk
Client: PM Kraftwerke AG
Year of Construction: 2020
Scope of Work:
complete weir systems
flap gate 10 × 3.5 m
horizontal TRC incl. fine rack
bottom outlet gate with flap on top
Hydropower Plant Murinsel
Client: Stadtwerke Bruck
Year of Construction: 2020
Scope of Work:
3 inlet gates 4.8 × 3.35 m
bottom outlet gate 4 × 5 m
double gate system
coarse rack system
Hydropower Plant Gurk
Client: Schuster Walter
Year of Construction: 2020
Scope of Work:
flap gate 6 × 2.7 m
flushing gate with flap on top
emergency inlet roller gate 8 × 2 m
Hydropower Plant Murinsel
Client: Stadtwerke Bruck
Year of Construction: 2020
Scope of Work:
10 inlet gates 2.5 × 3 m
Lock Nussdorf
Client: DHK
Year of Construction: 2020
Scope of Work:
seal replacement on lock gates 20 × 20 m
Hydropower Plant Gruberbach
Client: RFD Forstverwaltung
Year of Construction: 2020
Scope of Work:
flushing gates 0.6 × 1.7 m
Tyrolean weir with coarse rack
Hydropower Plant Vögerl an der Steyr
Client: WKW Vögerl GmbH
Year of Construction: 2019
Scope of Work:
flap gate 8 × 2.2 m
bottom outlet gate / flap
desander flushing gate
pressure pipeline – inlet gate
coarse trash rack
TRC 3 × 2.9 m
hydraulic unit and piping
Hydropower Plant Riesneralm
Client: Haider Bau
Year of Construction: 2019
Scope of Work:
4 gates
Hydropower Plant Pöls
Client: Saubere Energie
Year of Construction: 2019
Scope of Work:
flap gate 6.15 × 2.7 m
bottom outlet gate with flap on top
horizontal TRC
gates
Hydropower Plant Pisching
Client: Liechtenstein Energie
Year of Construction: 2019
Scope of Work:
complete weir systems
vertical TRC incl. fine trash rack
flap gate
Tyrolean trash rack
inlet gates
flushing gate
emergency gate
Hydropower Plant Kotzenmühlenwehr
Client: Leitha-Wasserverband
Year of Construction: 2019
Scope of Work:
flap gate 20 × 2.7 m
bottom outlet gate 5 × 2.9 m
electrical equipment
Fish Lift Maier
Client: Wasserwirth
Year of Construction: 2018
Scope of Work:
3 stainless steel gates
Hydropower Plant Seebach
Client: KW Ratschfeld GmbH
Year of Construction: 2018
Scope of Work:
Gate
Hydropower Plant Feßnachbach
Client: KW Reda GmbH
Year of Construction: 2018
Scope of Work:
gates
flap gate
flushing gate with flap on top
Hydropower Plant Pauer
Client: Pauer
Year of Construction: 2018
Scope of Work:
flap gate
emergency inlet gate
hydropower screw
Hydropower Plant Gasselsdorf
Client: WOMI
Year of Construction: 2018
Scope of Work:
flap gate
flushing gate with flap on top
Hydropower Plant Haunoldmühle
Client: Fuchs-Robetin GmbH
Year of Construction: 2018
Scope of Work:
2 flap gates
flushing gate with flap on top
2 horizontal TRCs
Hydropower Plant Lakhami - Georgien
Client: Global Hydro
Year of Construction: 2018
Scope of Work:
2 complete Tyrolean weir systems
25 gates
2 vertical trash rack cleaner
Hydropower Plant Jochberg
Client: HV Bau
Year of Construction: 2017
Scope of Work:
2 flap gates
flushing gates with flap on top
2 horizontal trash rack cleaner
Hydropower Plant Alvier Vorarlberg
Client: Vorarlberger Illwerke AG
Year of Construction: 2017
Scope of Work:
flap gate
gates
Hydropower Plant Wölzerbach
Client: Murauer Energiezentrum
Year of Construction: 2017
Scope of Work:
flap gate
vertical trash rack cleaner
gates
Hydropower Plant Ramingstein
Client: KW Ramingstein GmbH
Year of Construction: 2017
Scope of Work:
gates
flap gate
trash rack cleaner
Fish Lift Partenstein
Client: Wasserwirt
Year of Construction: 2017
Scope of Work:
compensation pipelines
gates
stainless steel construction
Hydropower Plant Aragvi - Georgien
Client: Energo Aragvi
Year of Construction: 2017
Scope of Work:
gates for Georgia
Hydropower Plant Köberlbach
Client: Köberlbach GmbH
Year of Construction: 2017
Scope of Work:
flap gate
MKF-Mur-Hydropower Plant Franz
Client: MKF GmbH
Year of Construction: 2016
Scope of Work:
vertical trash rack cleaner
inlet and outlet gates
FAH gate
compensation pipeline
Hydropower Plant Pengg
Client: Alpenkraft
Year of Construction: 2016
Scope of Work:
draft tube platform
generator roof
inlet gate
Hydropower Plant Rottenmann
Client: Stadtgemeinde Rottenmann
Year of Construction: 2016
Scope of Work:
vertical trash rack cleaner
Hydropower Plant Taurach
Client: Bundesforste
Year of Construction: 2016
Scope of Work:
gates
vertical trash rack cleaner
Tyrolean trash rack
compensation pipeline
Hydropower Plant Kirchberg Pielach
Client: Gemeinde Kirchberg
Year of Construction: 2016
Scope of Work:
horizontal trash rack cleaner
inlet gates
flushing gates with flap on top
FAH gate
Hydropower Plant Kohleben - Mürz
Scope of Work:
weir system with flap gate 25 × 3 m
complete equipment for hydraulic steel structures and mechanical systems
2 horizontal trash rack cleaner with flushing flap
Hydropower Plant Gassen
Client: Stadtwerke Mürzzuschlag
Year of Construction: 2016
Scope of Work:
weir system with flap gate 25 × 3 m
complete equipment for hydraulic steel structures and mechanical systems
2 horizontal trash rack cleaner with flushing flap
Hydropower Plant Lavantegg
Client: Pichler Energie
Year of Construction: 2015
Scope of Work:
flap gate
gates
trash rack cleaner
Hydropower Plant Krakauschatten Rantenbach
Client: KKW Krakauschatten GmbH
Year of Construction: 2015
Scope of Work:
flap gate 6.5 × 2.2 m
vertical trash rack cleaner
Hydropower Plant Zwatzhof
Client: Kajetan Nagele GmbH
Year of Construction: 2015
Scope of Work:
flap gate 10 × 2.1 m
horizontal trash rack cleaner
Hydropower Plant Dietrichhof
Client: Butz Alexandra
Year of Construction: 2015
Scope of Work:
Tyrolean weir system
Hydropower Plant Gösting
Client: E-Werk Gösting
Year of Construction: 2014
Scope of Work:
horizontal trash rack cleaner with horizontal rack
bottom outlet gate with counterweight and flushing flap
Hydropower Plant Johansbach I
Client: Envesta
Year of Construction: 2014
Scope of Work:
revitalization of gates and trash rack cleaners
Hydropower Plant Offner
Client: Offner Werkzeugindustrie
Year of Construction: 2014
Scope of Work:
weir system with flap gate 25 × 3 m
complete equipment for hydraulic steel structures and mechanical systems
Hydropower Plant Arndorfermühle
Client: Dr. Gab
Year of Construction: 2014
Scope of Work:
complete weir system with flap gate 7.5 × 2.3 m
horizontal trash rack cleaner
Hydropower Plant Seitenstallgraben
Client: Alexander Butz
Year of Construction: 2014
Scope of Work:
Tyrolean weir system
Hydropower Plant Stubenbergsee
Client: Energie Steiermark
Year of Construction: 2014
Scope of Work:
complete weir system with flap gate 14.5 × 2.25 m
Hydropower Plant Kurzteichen
Client: Liechtenstein Energie
Year of Construction: 2014
Scope of Work:
Tyrolean weir
Hydropower Plant - Fish pass - Malta-Reißeck
Client: Verbund
Year of Construction: 2013
Scope of Work:
15 stainless steel gates
incl. level control system
Hydropower Plant Gaal II
Client: MW-Wasserkraft
Year of Construction: 2013
Scope of Work:
Tyrolean weir
trash rack cleaner
Hydropower Plant Feisterer
Client: Liechtenstein Energie
Year of Construction: 2013
Scope of Work:
Tyrolean weir
trash rack cleaner
Hydropower Plant Schöder II
Client: Elektrowerk Schöder
Year of Construction: 2013
Scope of Work:
Tyrolean weir system with double telescopic mechanism
trash rack cleaner
Weir Adriach
Client: Verbund Hydro Power
Year of Construction: 2013
Scope of Work:
rehabilitation of chamber lock
Hydropower Plant Flitzenbach
Client: Agrar-Waldgemeinschaft
Year of Construction: 2013
Scope of Work:
Tyrolean weir
trash rack cleaner
Hydropower Plant Schwarzenseebach
Client: E-Werksgemeinschaft
Year of Construction: 2013
Scope of Work:
trash rack cleaner
weir flap gate
gates
Hydropower Plant Turrach
Client: Fürstlich Schwarzenberg
Year of Construction: 2012
Scope of Work:
flap gate 17 × 2.5 m
trash rack cleaner
flushing gate with flap on top
Flood Protection Görtschitz
Client: GLS
Year of Construction: 2012
Scope of Work:
lifting gate with flap
Hydropower Plant Zall/Torre - Albanien
Client: Hidroinvest
Year of Construction: 2012
Scope of Work:
flap gate 10 × 3.3 m
trash rack cleaner
gates
turbine distributor pipe
pressure pipeline connection to weir system
Hydropower Plant Vordernbergerbach
Client: Köhl Wasserkraft
Year of Construction: 2011
Scope of Work:
flap gate 6.7 × 1.5 m
trash rack cleaner
gates
turbine equipment
shut-off valve
S-type inlet
bypass line with ring piston valve
Hydropower Plant Lorenzerbach Unterstufe
Client: GGM Energie
Year of Construction: 2011
Scope of Work:
flap gate 5.7 × 2.3 m
trash rack cleaner
gates
Hydropower Plant Kammern
Client: 2G Wasserkraft
Year of Construction: 2011
Scope of Work:
flap gate 11 × 3.55 m
gates
trash rack cleaner (excavator-type)
cleaning width 5 m
Hydropower Plant Hinteres Triebental
Client: Envesta
Year of Construction: 2011
Scope of Work:
3 trash rack cleaner
6 Tyrolean weir systems
2 intake structures for water diversion
Hydropower Plant Piesting
Client: Strasser
Year of Construction: 2011
Scope of Work:
flap gate 12.2 × 3.1 m
Hydraulic Steel Structures Trabochersee
Client: Teerag Astag
Year of Construction: 2010
Scope of Work:
stainless steel gate 4 × 2 m
Hydropower Plant Sallabach
Client: KW Sallabach
Year of Construction: 2010
Scope of Work:
vertical trash rack cleaner
flushing flap
flap gate 10 × 1.5 m
Hydropower Plant Sumann / Liesing St. Michael
Client: Zotter
Year of Construction: 2010
Scope of Work:
horizontal trash rack cleaner
cleaning width 20 × 4 m
flushing flap approx. 3 × 3 m
flap gate 10 × 3.5 m
Hydropower Plant Johnsbach
Client: Investa
Year of Construction: 2010
Scope of Work:
Tyrolean weir system
Hydropower Plant Almbach
Client: Flick
Year of Construction: 2009
Scope of Work:
Tyrolean weir system
Theodoraweir
Client: VoestAlpine Donawitz
Year of Construction: 2009
Scope of Work:
flap gate 8 × 2 m
flushing flap 3 × 4 m
Hydropower Plant Isar
Client: Praterkraftwerksgesellschaft München
Year of Construction: 2009
Scope of Work:
horizontal trash rack cleaner with 20 m cleaning width × 4 m cleaning height
deep gate system approx. 6 × 6 m
retention height 12 m
set of stop logs 5 × 20 m
Hydropower Plant Gaalbach
Client: Kaltenegger Energie GmbH
Year of Construction: 2009
Scope of Work:
flap gate 10 × 2 m
flushing flap 2.5 × 2.5 m
vertical trash rack cleaner with 2.5 m cleaning width
Mur River facility
Client: VoestAlpine Donawitz
Year of Construction: 2007
Scope of Work:
trash rack cleaner with 3 m cleaning width – 8 m lifting height, 20 m travel distance (3 intake racks)
stop log 8 × 3 m
gate panels 3.5 × 3 m
Hydropower Plant Ranten
Client: Stadtgemeinde Murau
Year of Construction: 2007
Scope of Work:
flap gate 14 × 3 m
flushing flap 3 × 4 m
vertical trash rack cleaner with 4.5 m cleaning width
Hydropower Plant Schöder I
Client: Zedlucher
Year of Construction: 2006
Scope of Work:
Tyrolean weir system
Hydropower Plant Triebental
Client: Investa
Year of Construction: 2005
Scope of Work:
Tyrolean weir system
Hydropower Plant Klampfererstein
Client: Flick
Year of Construction: 2005
Scope of Work:
Tyrolean weir system
Hydropower Plant Mödering
Client: Flick
Year of Construction: 2005
Scope of Work:
Tyrolean weir system